The speed at which permits can be issued during turnarounds can have a large effect upon overall performance, with any delays in issuing impacting upon the time taken to get the job done. RAP4’s upfront planning capability, its flexible rules and scanning features greatly enhance this process, giving potential for considerable savings, with one large (1-million-man hours) Turnaround being reduced by 3 days.
The reduction in hold-ups is complemented by the smooth alignment of work processes, with the Contractors, Planners and Operations personnel all working together in complete understanding.
The RAP Turnaround Module enables additional functionality in the RAP4 system allowing the user to:
As well as the use of bar and QR codes turnaround scanning also allows the utilisation of RFID cards in remote locations with dedicated terminals, giving enhanced control, easier visibility of jobs and improved awareness. By utilising RFID cards, QR or barcoding users can:
Due to ever increasing demands from the site as a whole and pressure to complete more and more forms, get more and more signatures leaving less and less time to actually look at jobs, the refinery chose RAP to resolve these issues and to instill efficiency on-site. With RAP’s flexibility and configurability we have added to the system since 2006 to help with more processes on-site such as Turnarounds. These additions enabled very fast permit handling, improved contractor discipline and greatly improved awareness throughout the site and very successful turnarounds.
Senior Operations Manager
Worldscale Refinery
The use of bar and QR codes in turnarounds gives enhanced control, easier and faster visibility of jobs without losing accuracy and improved awareness, resulting in:
A comprehensive yet simple to use Isolation module, allowing users to ensure that all energy sources associated with any equipment to be worked on, have been completely removed.
Digital Permit to Work is your front-line method of keeping people safe. Providing risk identification, mitigation, and communication key components of safe Control of Work.
Reporting in RAP4 allows the user to create and run reports using current and historical data derived from all Job, Task, Isolation and Personnel activity in RAP. For example, a report could be created showing all permits completed in an area over a given time period.
RAP4 can be configured to use plot plans/maps hosted by WMS (Web Map Service) servers. Most major GIS providers support WMS. WMS maps can have multiple layers which can be turned on/off by the end user, and different information can be displayed at different zoom levels.